THE NEW BUILDING PROCESS
Conception & Design

This phase is where the initial idea is formalized. The builder often collaborates with the client and design team (Architects, Engineers).

  • Initial Feasibility: Determining if the project is practical, financially viable, and meets zoning/code requirements.
  • Design Development: Architects create conceptual, schematic, and detailed design drawings, floor plans, and elevations.
  • Value Engineering: The builder contributes expertise to analyze the design for cost-saving opportunities or improved efficiency.
  • Construction Documents: Finalizing all detailed blueprints, specifications, and schedules that will be used for permitting and bidding

Pre-construction & Procuremen

This phase moves from planning to execution readiness

  • Final Budgeting & Estimating: Producing a firm cost estimate based on the final design documents.
  • Permitting: Submitting drawings and applications to local authorities to secure all necessary building permits and approvals.
  • Project Scheduling: Creating a detailed timeline (Gantt chart) for all project activities, deliveries, and inspections.
  • Mobilization: Setting up the site, including temporary offices, fencing, safety equipment, and utility connections

Site work and Foundation

The physical construction begins.

  • Site Preparation: Clearing, demolition (if needed), grading, and leveling the land.
  • Excavation: Digging trenches and foundations for below-ground structures.
  • Utilities Rough-In: Installing underground pipes and service lines (water, sewer, gas, electrical).
  • Foundation: Pouring and curing concrete for footings, slabs, and foundation walls to establish the project's base